BuiltByEstradaBook a call

Concrete slab calculator

FREE TOOL

Feet or meters. Cubic yards, a truck order rounded up, and bag counts, with waste in its own line.

Volume with waste

7.78 yd³ (210 ft³)

Truck order (rounded up to ¼ yd³ or ¼ m³)

8.00 yd³

80 lb bags (0.60 ft³ each)

350

60 lb bags (0.45 ft³ each)

467

Flat rectangular slab, no thickened edges. Figure beams and piers separately and add them.

Estimate only. It doesn't know your site, market or costs. Check results before a bid, contract or purchase.

How the math works

Volume is length × width × thickness in one unit. In feet, divide the thickness in inches by 12 to get cubic feet, then divide by 27 for cubic yards. In meters, divide the thickness in centimeters by 100 to get cubic meters. Waste is added to the volume before anything is rounded.

Cubic feet = L × W × (T in ÷ 12) × (1 + waste)
Cubic yards = cubic feet ÷ 27
Cubic meters = L × W × (T cm ÷ 100) × (1 + waste)
80 lb bags = cubic feet ÷ 0.60, rounded up
60 lb bags = cubic feet ÷ 0.45, rounded up

The truck order rounds up to the next quarter yard, or the next quarter cubic meter in metric mode. The bag yields, 0.60 ft³ for an 80 lb bag and 0.45 ft³ for a 60 lb bag, are the ones this calculator uses. Check the yield printed on the bag you buy.

The example above

A 30 × 20 ft slab, 4 in thick: 30 × 20 × 4 ÷ 12 = 200 ft³. With 5% waste that is 210 ft³, or 7.78 yd³. Order 8.00 yd³ from the plant, or buy 350 bags of 80 lb or 467 bags of 60 lb.